Commit
This commit does not belong to any branch on this repository, and may belong to a fork outside of the repository.
# Description Shoko I fixed an issue with the job queue in the Lobby. - Add arrival Dock door. ( face the right way) - Fixed cryogenic sleep unit Near arrival. - Add ChemMaster 4000 for botany and kitchen additionally microwave - Add power/atmos monitoring computers, increase CE's room, and Fireaxe. Remove bed (sorry CE) - Remove the Pacman generator, relocate the power monitoring computer close to the generator and engineer suit close to the communication server, and expand the AME deployed Zone. - Add radiators, pipes, and gas tank dispenser at small burn chamber - Add a waste valve and power/atmos monitoring computers at the Thermal-electric generator - Remove some of the Heating Loop pipes. - Add a plasma table with two Emergency flares, and one flare gun near the Main burning chamber. - Add a plasma table with a Cell recharger Near the Main burning chamber. - Reorganize atmospheric room pipings (Thank you, DV Mapping editor) - Copy Delta-V idea airlock at Coolant Loop for easy access. (Thank you, Mapping editor) - Add Glass in both Northwest Southeast solar rooms, and remove the fax machine. - Add 10 materials to the service room. - Add additional wiring command's bar room. - Add a secured crate to the vault. - Add dock doors and additional lights, relocate Mass scanner computer. (fixed right position dock door) - Reorganize the Cargo bay. - Reorganize Medical Department - Add SMES Command Sub room. :cl: Mike32oz - The Nanotrasen Financial has approved a budget increase for Station Shōkō. (Glory to Nanotrasen)
- Loading branch information