- Phase 0 Detail design of cabin
- Phase1 Construction of cabin
- Phase 2 Wiring, * Plumbing and furniture installation of cabin
- Phase 3 Detail design of catamaran hulls
- Phase 4 construction of catamaran hulls
- Phase 5 Connect cabin to hull
- Phase 6 Autodocking and instrumentation of electrical hardware
- Phase 7 Add auto leveling of boat
- Phase 8 Add second floor of boat
- Phase 9 Add wheels for trans* Port
- Phase 10 Add Kite to the boat
- Phase 11 Add foils to the boat
- Phase 12 Add fla* P* Ping foils to the boat
- Phase 13 Automate navigation
- Phase 14 Auto maintains of Boat