Skip to content

Background and Motivation

Heron Yang edited this page Feb 6, 2018 · 7 revisions
  • The SEASAR (Single European Sky ATM Research) project predicts a doubling in the number of flights between 2005 and 2020. [Atkin2010]
  • 60 articles have been published on the topic of arrival scheduling and planning (Mesgarpour, Potts, and Bennel 2010)
  • The total cost of domestic air traffic delays to the S economy was estimated to be about $41 billion in 2007 alone [Lee-MIT]
  • The JEC report also stated that 58%, 20%, and 8% of flight delays occurred at the gates, taxiing out to the runway, and taxiing into the gates upon landing, respectively, while only 15% of the total delays were airborne delays

Problem

Settings

Input parameters [clare2009]

  • Airport
  • Aircraft
  • Separation Rules
  • Decision variables

Constraints

  • initial conditions
  • virtual nodes
  • routing constraints
  • taxi timing constraints: speed
  • taxi time constraints: conflict
  • cost-to-go
  • runway scheduling
  • departure runway planning foresight

Objective

  • makespan
  • conflict
  • total taxi time
  • global cost function (fuel costs, emission costs [Levinson, Kanafani, and Gillen 1999], crew and passenger costs)[Clare 2009]

Existing Tools & Data