Use reusable integration test workflow #1853
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
ci.yaml
on: pull_request
Build charm
/
...
/
Get workflow version
7s
Lint
/
Lint .github/workflows/
5s
Lint
/
tox run -e lint
22s
Check libraries
23s
Matrix: Unit test charm
Matrix: Build charm / build
Matrix: integration-test
Annotations
7 errors
Check libraries
Charmcraft libraries are not up to date.
|
Unit test charm (2.9)
Process completed with exit code 1.
|
Unit test charm (3.1)
The job was canceled because "_2_9" failed.
|
Unit test charm (3.1)
The operation was canceled.
|
Integration test charm | 3.1.6 / test_backups.py | group 1
Process completed with exit code 1.
|
Integration test charm | 3.1.6 / high_availability/test_self_healing.py | group 1
Canceling since a higher priority waiting request for 'Tests-refs/pull/354/merge-3' exists
|
Integration test charm | 3.1.6 / high_availability/test_self_healing.py | group 1
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
charms-packed-with-cache
Expired
|
27.3 MB |
|
intergration-test-charm-logs-lxd-juju-2.9.45
Expired
|
6.76 MB |
|
intergration-test-charm-logs-lxd-juju-3.1.6
Expired
|
6.59 MB |
|