Skip to content

Use reusable integration test workflow #1849

Use reusable integration test workflow

Use reusable integration test workflow #1849

Triggered via pull request November 15, 2023 11:43
Status Failure
Total duration 1h 17m 44s
Artifacts 3
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

ci.yaml

on: pull_request
Build charm  /  ...  /  Get workflow version
7s
Build charm / Get workflow version / Get workflow version
Lint  /  Lint .github/workflows/
4s
Lint / Lint .github/workflows/
Lint  /  tox run -e lint
21s
Lint / tox run -e lint
Check libraries
23s
Check libraries
Matrix: Unit test charm
Build charm  /  Collect charms
12s
Build charm / Collect charms
Matrix: Build charm / build
Matrix: integration-test
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Check libraries
Charmcraft libraries are not up to date.
Unit test charm (2.9)
Process completed with exit code 1.
Unit test charm (3.1)
The job was canceled because "_2_9" failed.
Unit test charm (3.1)
The operation was canceled.
Integration test charm | 3.1.6 / high_availability/test_self_healing.py | group 1
Process completed with exit code 1.
Integration test charm | 3.1.6 / relations/test_database.py | group 1
Process completed with exit code 1.
Integration test charm | 3.1.6 / test_backups.py | group 1
Process completed with exit code 1.
Integration test charm | 2.9.45 / relations/test_database.py | group 1
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
charms-packed-with-cache Expired
27.3 MB
intergration-test-charm-logs-lxd-juju-2.9.45 Expired
6.56 MB
intergration-test-charm-logs-lxd-juju-3.1.6 Expired
6.58 MB