Skip to content

Use reusable integration test workflow #1848

Use reusable integration test workflow

Use reusable integration test workflow #1848

Triggered via pull request November 15, 2023 10:42
Status Failure
Total duration 47m 21s
Artifacts 1
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

ci.yaml

on: pull_request
Build charm  /  ...  /  Get workflow version
3s
Build charm / Get workflow version / Get workflow version
Lint  /  Lint .github/workflows/
7s
Lint / Lint .github/workflows/
Lint  /  tox run -e lint
28s
Lint / tox run -e lint
Check libraries
30s
Check libraries
Matrix: Unit test charm
Build charm  /  Collect charms
9s
Build charm / Collect charms
Matrix: Build charm / build
Matrix: Integration test charm
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Check libraries
Charmcraft libraries are not up to date.
Lint / tox run -e lint
Process completed with exit code 1.
Unit test charm (2.9)
Process completed with exit code 1.
Unit test charm (3.1)
The job was canceled because "_2_9" failed.
Unit test charm (3.1)
Process completed with exit code 1.
Integration test charm (2.9.45) / Collect integration test groups
Process completed with exit code 2.
Integration test charm (3.1.6) / Collect integration test groups
Process completed with exit code 2.

Artifacts

Produced during runtime
Name Size
charms-packed-with-cache Expired
27.3 MB