Skip to content

Merge pull request #55 from woblerr/bump_infr #248

Merge pull request #55 from woblerr/bump_infr

Merge pull request #55 from woblerr/bump_infr #248

Re-run triggered January 25, 2025 21:19
Status Failure
Total duration 9m 36s
Artifacts

build.yml

on: push
Matrix: build_gpdb_image
Matrix: build_image
Fit to window
Zoom out
Zoom in

Annotations

14 errors and 2 warnings
build_gpdb_image (2.50_arenadata4)
Process completed with exit code 1.
build_gpdb_image (2.52_arenadata7)
The job was canceled because "_2_50_arenadata4" failed.
build_gpdb_image (2.52_arenadata7)
The operation was canceled.
build_gpdb_image (2.47_arenadata4)
The job was canceled because "_2_50_arenadata4" failed.
build_gpdb_image (2.47_arenadata4)
The operation was canceled.
build_image (2.52.1)
Process completed with exit code 1.
build_image (2.53.1)
The job was canceled because "_2_52_1" failed.
build_image (2.53.1)
The operation was canceled.
build_image (2.54.1)
The job was canceled because "_2_52_1" failed.
build_image (2.54.1)
The operation was canceled.
build_image (2.54.0)
The job was canceled because "_2_52_1" failed.
build_image (2.54.0)
The operation was canceled.
build_image (2.53)
The job was canceled because "_2_52_1" failed.
build_image (2.53)
The operation was canceled.
build_gpdb_image (2.50_arenadata4)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
build_image (2.52.1)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636