Addition of Recharge Node CVPM 08 #70
base: master
Are you sure you want to change the base?
Conversation
One recharge node RECH8 is added and connected with c173 and hgr08 via two links: c173-rech8 and rech8-hgr08
Hi @msdogan, |
Hi @msdogan, in talking with Mahesh, I'd expressed that I didn't think we should add this node to the core calvin network data until it's an active facility in California and right now it's proposed facility, but we wanted your input. I'd rather wait than need to deal with removing it if the facility ends up not existing. |
@mlmaskey your file is incorrect here: data/rech8-hgr08/terminus |
@mlmaskey if all file paths are correct, maybe check on upper and lower cases and make sure they are consistent. |
Recharge cost 1500/12: annualized cost, Figure 4 Perrone, D., & Rohde, M. M. (2016). Benefits and economic costs of managed aquifer recharge in California. San Francisco Estuary and Watershed Science, 14(2).
One recharge node RECH8 is added and connected with c173 and hgr08 via two links: c173-rech8 and rech8-hgr08