Skip to content

Setup Go test

Setup Go test #1

Triggered via push October 16, 2023 11:08
Status Failure
Total duration 2m 23s
Artifacts

ci.yaml

on: push
Matrix: test-cache
Fit to window
Zoom out
Zoom in

Annotations

8 errors
test-cache (1.19)
Process completed with exit code 1.
test-cache (1.17)
Process completed with exit code 1.
test-cache (1.18)
The job was canceled because "_1_19" failed.
test-cache (1.18)
The operation was canceled.
test-cache (1.20)
The job was canceled because "_1_19" failed.
test-cache (1.20)
The operation was canceled.
test-cache (1.21)
The job was canceled because "_1_19" failed.
test-cache (1.21)
The operation was canceled.