Skip to content

Improve connection&.close handling. #131

Improve connection&.close handling.

Improve connection&.close handling. #131

Triggered via push September 3, 2024 22:42
Status Failure
Total duration 45s
Artifacts
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors
3.2 on ubuntu
Process completed with exit code 1.
3.2 on macos
The job was canceled because "ubuntu_3_2" failed.
3.2 on macos
The operation was canceled.
3.3 on macos
The job was canceled because "ubuntu_3_2" failed.
3.3 on macos
The operation was canceled.
3.1 on ubuntu
The job was canceled because "ubuntu_3_2" failed.
3.1 on ubuntu
The operation was canceled.
3.3 on ubuntu
The job was canceled because "ubuntu_3_2" failed.
3.3 on ubuntu
The operation was canceled.
3.1 on macos
The job was canceled because "ubuntu_3_2" failed.
3.1 on macos
The operation was canceled.