Skip to content

Upgrade deps

Upgrade deps #1510

Triggered via pull request January 30, 2025 08:57
Status Failure
Total duration 2m 58s
Artifacts

ci.yml

on: pull_request
Matrix: Test Suite
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 2 warnings
Test Suite (linux-musl, stable)
Process completed with exit code 101.
Test Suite (linux, stable)
The job was canceled because "linux-musl_stable" failed.
Test Suite (linux, stable)
The operation was canceled.
Test Suite (linux-aarch64, stable)
The job was canceled because "linux-musl_stable" failed.
Test Suite (linux-aarch64, stable)
The operation was canceled.
Test Suite (linux-arm, stable)
The job was canceled because "linux-musl_stable" failed.
Test Suite (linux-arm, stable)
The operation was canceled.
Test Suite (macos-aarch64, stable)
[email protected] 1.1.1w is already installed and up-to-date. To reinstall 1.1.1w, run: brew reinstall [email protected]
Test Suite (macos, stable)
[email protected] 1.1.1w is already installed and up-to-date. To reinstall 1.1.1w, run: brew reinstall [email protected]