Skip to content

Continuous Integration #445

Continuous Integration

Continuous Integration #445

Triggered via schedule October 6, 2024 01:46
Status Failure
Total duration 3m 36s
Artifacts

ci.yml

on: schedule
Matrix: Test
Result (CI)
0s
Result (CI)
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Clippy
Process completed with exit code 101.
Test (stable, macos-latest)
Process completed with exit code 101.
Test (stable, windows-latest)
The job was canceled because "stable_macos-latest" failed.
Test (stable, windows-latest)
The operation was canceled.
Test (stable, ubuntu-latest)
The job was canceled because "stable_macos-latest" failed.
Test (stable, ubuntu-latest)
The operation was canceled.