Skip to content

REVAI-3853: addressing feedback (#225) #459

REVAI-3853: addressing feedback (#225)

REVAI-3853: addressing feedback (#225) #459

Triggered via push December 21, 2023 21:48
Status Failure
Total duration 3m 29s
Artifacts

build_test.yml

on: push
Matrix: integration-tests
Matrix: lint
Matrix: unit-tests
Fit to window
Zoom out
Zoom in

Annotations

11 errors
integration-tests (16.x)
Process completed with exit code 1.
integration-tests (17.x)
The job was canceled because "_16_x" failed.
integration-tests (17.x)
The operation was canceled.
integration-tests (12.x)
The job was canceled because "_16_x" failed.
integration-tests (12.x)
The operation was canceled.
integration-tests (10.x)
The job was canceled because "_16_x" failed.
integration-tests (10.x)
The operation was canceled.
integration-tests (8.x)
The job was canceled because "_16_x" failed.
integration-tests (8.x)
The operation was canceled.
integration-tests (14.x)
The job was canceled because "_16_x" failed.
integration-tests (14.x)
The operation was canceled.