init #1352
standard-test.yaml
on: push
unit tests
5m 40s
Matrix: e2e fork test
Annotations
17 errors and 1 warning
e2e fork test (ETH)
The run was canceled by @rouzwelt.
|
e2e fork test (ETH)
The operation was canceled.
|
e2e fork test (ARBITRUM)
The run was canceled by @rouzwelt.
|
e2e fork test (ARBITRUM)
The operation was canceled.
|
e2e fork test (FLARE)
The run was canceled by @rouzwelt.
|
e2e fork test (FLARE)
The operation was canceled.
|
e2e fork test (POLYGON)
The run was canceled by @rouzwelt.
|
e2e fork test (POLYGON)
The operation was canceled.
|
e2e fork test (BSC)
The run was canceled by @rouzwelt.
|
e2e fork test (BSC)
The operation was canceled.
|
e2e fork test (BASE)
The run was canceled by @rouzwelt.
|
e2e fork test (BASE)
The operation was canceled.
|
e2e fork test (LINEA)
The run was canceled by @rouzwelt.
|
e2e fork test (LINEA)
The operation was canceled.
|
e2e fork test (MATCHAIN)
The run was canceled by @rouzwelt.
|
e2e fork test (MATCHAIN)
The operation was canceled.
|
unit tests
Process completed with exit code 7.
|
unit tests
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|