Skip to content

refactor: replace MongoDBProxy usage with direct pymongo config #29640

refactor: replace MongoDBProxy usage with direct pymongo config

refactor: replace MongoDBProxy usage with direct pymongo config #29640

Triggered via pull request September 27, 2024 18:55
Status Failure
Total duration 8m 57s
Artifacts 6

unit-tests.yml

on: pull_request
Matrix: run-tests
collect-and-verify
4m 5s
collect-and-verify
compile-warnings-report
0s
compile-warnings-report
Unit tests successful
1s
Unit tests successful
Matrix: coverage
merge-artifacts
0s
merge-artifacts
Fit to window
Zoom out
Zoom in

Annotations

26 errors
xmodule-with-cms(py=3.11,dj=pinned,mongo=7.0)
Process completed with exit code 1.
openedx-1-with-cms(py=3.11,dj=pinned,mongo=7.0)
The job was canceled because "_3_11_pinned_xmodule-wi_2" failed.
openedx-1-with-cms(py=3.11,dj=pinned,mongo=7.0)
The operation was canceled.
xmodule-with-lms(py=3.11,dj=pinned,mongo=7.0)
The job was canceled because "_3_11_pinned_xmodule-wi_2" failed.
xmodule-with-lms(py=3.11,dj=pinned,mongo=7.0)
The operation was canceled.
lms-3(py=3.11,dj=pinned,mongo=7.0)
The job was canceled because "_3_11_pinned_xmodule-wi_2" failed.
lms-3(py=3.11,dj=pinned,mongo=7.0)
The operation was canceled.
lms-4(py=3.11,dj=pinned,mongo=7.0)
The job was canceled because "_3_11_pinned_xmodule-wi_2" failed.
lms-4(py=3.11,dj=pinned,mongo=7.0)
The operation was canceled.
lms-5(py=3.11,dj=pinned,mongo=7.0)
The job was canceled because "_3_11_pinned_xmodule-wi_2" failed.
lms-5(py=3.11,dj=pinned,mongo=7.0)
The operation was canceled.
openedx-1-with-lms(py=3.11,dj=pinned,mongo=7.0)
The job was canceled because "_3_11_pinned_xmodule-wi_2" failed.
openedx-1-with-lms(py=3.11,dj=pinned,mongo=7.0)
The operation was canceled.
lms-6(py=3.11,dj=pinned,mongo=7.0)
The job was canceled because "_3_11_pinned_xmodule-wi_2" failed.
lms-6(py=3.11,dj=pinned,mongo=7.0)
The operation was canceled.
common-with-lms(py=3.11,dj=pinned,mongo=7.0)
The job was canceled because "_3_11_pinned_xmodule-wi_2" failed.
common-with-lms(py=3.11,dj=pinned,mongo=7.0)
The operation was canceled.
lms-2(py=3.11,dj=pinned,mongo=7.0)
The job was canceled because "_3_11_pinned_xmodule-wi_2" failed.
lms-2(py=3.11,dj=pinned,mongo=7.0)
The operation was canceled.
openedx-2-with-lms(py=3.11,dj=pinned,mongo=7.0)
The job was canceled because "_3_11_pinned_xmodule-wi_2" failed.
openedx-2-with-lms(py=3.11,dj=pinned,mongo=7.0)
The operation was canceled.
cms-2(py=3.11,dj=pinned,mongo=7.0)
The job was canceled because "_3_11_pinned_xmodule-wi_2" failed.
cms-2(py=3.11,dj=pinned,mongo=7.0)
The operation was canceled.
lms-1(py=3.11,dj=pinned,mongo=7.0)
The job was canceled because "_3_11_pinned_xmodule-wi_2" failed.
lms-1(py=3.11,dj=pinned,mongo=7.0)
The operation was canceled.
Unit tests successful
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
coverage-cms-1
1.03 MB
coverage-common-with-cms
1.31 MB
coverage-openedx-2-with-cms
1.44 MB
pytest-warnings-json-cms-1
2.74 KB
pytest-warnings-json-common-with-cms
5.43 KB
pytest-warnings-json-openedx-2-with-cms
6.77 KB