Skip to content

Laravel 12.x Compatibility #56

Laravel 12.x Compatibility

Laravel 12.x Compatibility #56

Triggered via pull request February 19, 2025 05:09
Status Failure
Total duration 40s
Artifacts

run-tests.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

65 errors
P8.2 - L12.* - prefer-stable - ubuntu-latest
Option orchestra/testbench is missing a version constraint, use e.g. orchestra/testbench:^1.0
P8.2 - L12.* - prefer-stable - ubuntu-latest
Process completed with exit code 1.
P8.3 - L12.* - prefer-stable - ubuntu-latest
Option orchestra/testbench is missing a version constraint, use e.g. orchestra/testbench:^1.0
P8.3 - L12.* - prefer-stable - ubuntu-latest
Process completed with exit code 1.
P8.3 - L12.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.3 - L12.* - prefer-lowest - ubuntu-latest
Option orchestra/testbench is missing a version constraint, use e.g. orchestra/testbench:^1.0
P8.3 - L12.* - prefer-lowest - ubuntu-latest
Process completed with exit code 1.
P8.3 - L10.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.3 - L11.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.2 - L9.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.3 - L12.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.1 - L9.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8 - L9.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.2 - L12.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8 - L9.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.1 - L9.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.2 - L10.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.2 - L11.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.2 - L11.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.2 - L10.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.3 - L9.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.2 - L9.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.3 - L9.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.3 - L9.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.1 - L10.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.3 - L12.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.3 - L10.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.3 - L10.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.3 - L11.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.2 - L12.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.1 - L10.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8 - L9.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.3 - L11.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.3 - L11.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.2 - L11.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.2 - L11.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8.2 - L11.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.2 - L11.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.2 - L12.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.2 - L12.* - prefer-lowest - ubuntu-latest
Option orchestra/testbench is missing a version constraint, use e.g. orchestra/testbench:^1.0
P8.2 - L12.* - prefer-lowest - ubuntu-latest
Process completed with exit code 1.
P8.3 - L9.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.3 - L9.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8.1 - L10.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.2 - L9.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.1 - L10.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.2 - L9.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.1 - L10.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.1 - L10.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8 - L9.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.2 - L10.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8 - L9.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8.2 - L10.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8.3 - L10.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.3 - L10.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.3 - L11.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.3 - L11.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8.1 - L9.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.1 - L9.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8.2 - L10.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.2 - L10.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.1 - L9.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.1 - L9.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.2 - L9.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_12____2" failed.
P8.2 - L9.* - prefer-stable - ubuntu-latest
The operation was canceled.