Skip to content

Merge pull request #3104 from jandubois/yaml-strict #6683

Merge pull request #3104 from jandubois/yaml-strict

Merge pull request #3104 from jandubois/yaml-strict #6683

Triggered via push January 10, 2025 18:14
Status Success
Total duration 20m 57s
Artifacts 1

test.yml

on: push
Lints
2m 9s
Lints
Spell check
8s
Spell check
Windows tests
5m 1s
Windows tests
Integration tests (QEMU, macOS host)
10m 0s
Integration tests (QEMU, macOS host)
VMNet tests (QEMU)
8m 33s
VMNet tests (QEMU)
Matrix: Colima tests (QEMU, Linux host)
Matrix: Integration tests (QEMU, Linux host)
Matrix: Unit tests
Matrix: Upgrade tests (QEMU, macOS host)
Matrix: Integration tests (vz)
Fit to window
Zoom out
Zoom in

Annotations

5 warnings
Integration tests (vz) (default.yaml, true)
jq 1.7.1 is already installed and up-to-date. To reinstall 1.7.1, run: brew reinstall jq
Integration tests (QEMU, macOS host)
curl 8.11.1 is already installed and up-to-date. To reinstall 8.11.1, run: brew reinstall curl
Integration tests (QEMU, macOS host)
jq 1.7.1 is already installed and up-to-date. To reinstall 1.7.1, run: brew reinstall jq
Integration tests (vz) (fedora.yaml, false)
jq 1.7.1 is already installed and up-to-date. To reinstall 1.7.1, run: brew reinstall jq
Colima tests (QEMU, Linux host) (v0.6.5)
Attempt 1 failed. Reason: Child_process exited with error code 1

Artifacts

Produced during runtime
Name Size
failure-logs-upgrade
38.3 KB