templates: add centos-stream-10 #6615
test.yml
on: pull_request
Lints
2m 50s
Spell check
8s
Windows tests
2m 55s
Integration tests (QEMU, macOS host)
9m 35s
VMNet tests (QEMU)
8m 20s
Matrix: Colima tests (QEMU, Linux host)
Matrix: Integration tests (QEMU, Linux host)
Matrix: Unit tests
Matrix: Upgrade tests (QEMU, macOS host)
Matrix: Integration tests (vz)
Annotations
1 error and 5 warnings
Integration tests (vz) (default.yaml, true)
Process completed with exit code 1.
|
Integration tests (vz) (fedora.yaml, false)
jq 1.7.1 is already installed and up-to-date.
To reinstall 1.7.1, run:
brew reinstall jq
|
Integration tests (QEMU, macOS host)
curl 8.11.1 is already installed and up-to-date.
To reinstall 8.11.1, run:
brew reinstall curl
|
Integration tests (QEMU, macOS host)
jq 1.7.1 is already installed and up-to-date.
To reinstall 1.7.1, run:
brew reinstall jq
|
Colima tests (QEMU, Linux host) (v0.6.5)
Attempt 1 failed. Reason: Child_process exited with error code 1
|
Integration tests (vz) (default.yaml, true)
jq 1.7.1 is already installed and up-to-date.
To reinstall 1.7.1, run:
brew reinstall jq
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
failure-logs-upgrade
|
38.5 KB |
|
failure-logs-vz-default_yaml
|
11 KB |
|