Merge pull request #1951 from AkihiroSuda/vz-default #5424
test.yml
on: push
Lints
4m 32s
Windows tests
5m 44s
Integration tests
11m 10s
VMNet test
9m 8s
Matrix: Colima
Matrix: Integration tests (on Linux)
Matrix: Unit tests
Matrix: Upgrade test
Matrix: vz
Annotations
11 warnings
Integration tests
curl 8.9.1 is already installed and up-to-date.
To reinstall 8.9.1, run:
brew reinstall curl
|
Integration tests
jq 1.7.1 is already installed and up-to-date.
To reinstall 1.7.1, run:
brew reinstall jq
|
Integration tests
Failed to restore: "/usr/local/bin/gtar" failed with error: The process '/usr/local/bin/gtar' failed with exit code 2
|
Upgrade test (v0.15.1)
Failed to restore: "/usr/local/bin/gtar" failed with error: The process '/usr/local/bin/gtar' failed with exit code 2
|
Upgrade test (v0.15.1)
qemu 9.0.2 is already installed and up-to-date.
To reinstall 9.0.2, run:
brew reinstall qemu
|
VMNet test
qemu 9.0.2 is already installed and up-to-date.
To reinstall 9.0.2, run:
brew reinstall qemu
|
VMNet test
Failed to restore: "/usr/local/bin/gtar" failed with error: The process '/usr/local/bin/gtar' failed with exit code 2
|
vz (fedora.yaml)
jq 1.7.1 is already installed and up-to-date.
To reinstall 1.7.1, run:
brew reinstall jq
|
vz (fedora.yaml)
Failed to restore: "/usr/local/bin/gtar" failed with error: The process '/usr/local/bin/gtar' failed with exit code 2
|
vz (default.yaml)
jq 1.7.1 is already installed and up-to-date.
To reinstall 1.7.1, run:
brew reinstall jq
|
vz (default.yaml)
Failed to restore: "/usr/local/bin/gtar" failed with error: The process '/usr/local/bin/gtar' failed with exit code 2
|