Create amazonlinux2023 template #5422
test.yml
on: pull_request
Lints
4m 29s
Windows tests
7m 8s
Integration tests
15m 56s
VMNet test
10m 27s
Matrix: Colima
Matrix: Integration tests (on Linux)
Matrix: Unit tests
Matrix: Upgrade test
Matrix: vz
Annotations
12 warnings
VMNet test
qemu 9.0.2 is already installed and up-to-date.
To reinstall 9.0.2, run:
brew reinstall qemu
|
VMNet test
Failed to restore: "/usr/local/bin/gtar" failed with error: The process '/usr/local/bin/gtar' failed with exit code 2
|
Upgrade test (v0.15.1)
Failed to restore: "/usr/local/bin/gtar" failed with error: The process '/usr/local/bin/gtar' failed with exit code 2
|
Upgrade test (v0.15.1)
qemu 9.0.2 is already installed and up-to-date.
To reinstall 9.0.2, run:
brew reinstall qemu
|
vz (experimental/vz.yaml)
Failed to restore: "/usr/local/bin/gtar" failed with error: The process '/usr/local/bin/gtar' failed with exit code 2
|
vz (experimental/vz.yaml)
jq 1.7.1 is already installed and up-to-date.
To reinstall 1.7.1, run:
brew reinstall jq
|
Integration tests
curl 8.9.1 is already installed and up-to-date.
To reinstall 8.9.1, run:
brew reinstall curl
|
Integration tests
jq 1.7.1 is already installed and up-to-date.
To reinstall 1.7.1, run:
brew reinstall jq
|
Integration tests
Failed to restore: "/usr/local/bin/gtar" failed with error: The process '/usr/local/bin/gtar' failed with exit code 2
|
vz (fedora.yaml)
Received request to deprovision: The request was cancelled by the remote provider.
|
vz (fedora.yaml)
jq 1.7.1 is already installed and up-to-date.
To reinstall 1.7.1, run:
brew reinstall jq
|
vz (fedora.yaml)
Failed to restore: "/usr/local/bin/gtar" failed with error: The process '/usr/local/bin/gtar' failed with exit code 2
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
failure-logs-upgrade
Expired
|
38.2 KB |
|