Skip to content

Handle fallible per commitment point in channel establishment #15457

Handle fallible per commitment point in channel establishment

Handle fallible per commitment point in channel establishment #15457

Triggered via pull request September 18, 2024 23:55
Status Failure
Total duration 6h 0m 42s
Artifacts

build.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

13 errors
linting
Process completed with exit code 101.
build (macos-latest, beta)
Process completed with exit code 101.
build (macos-latest, stable)
Process completed with exit code 101.
build (ubuntu-latest, beta)
Process completed with exit code 101.
build (ubuntu-latest, stable)
Process completed with exit code 101.
build (ubuntu-latest, 1.63.0)
Process completed with exit code 101.
build (macos-latest, 1.63.0)
Process completed with exit code 101.
build (windows-latest, beta)
Process completed with exit code 101.
build (windows-latest, stable)
Process completed with exit code 101.
build (windows-latest, 1.63.0)
The job running on runner GitHub Actions 15 has exceeded the maximum execution time of 360 minutes.
build (windows-latest, 1.63.0)
The operation was canceled.
incremental-mutants
The job running on runner GitHub Actions 10 has exceeded the maximum execution time of 360 minutes.
incremental-mutants
The operation was canceled.