Handle fallible per commitment point in channel establishment #15457
Triggered via pull request
September 18, 2024 23:55
Status
Failure
Total duration
6h 0m 42s
Artifacts
–
build.yml
on: pull_request
coverage
6m 39s
benchmark
17m 54s
check_commits
16m 32s
check_release
1m 59s
fuzz
1h 24m
linting
1m 1s
rustfmt
13s
incremental-mutants
6h 0m
Matrix: build
Annotations
13 errors
linting
Process completed with exit code 101.
|
build (macos-latest, beta)
Process completed with exit code 101.
|
build (macos-latest, stable)
Process completed with exit code 101.
|
build (ubuntu-latest, beta)
Process completed with exit code 101.
|
build (ubuntu-latest, stable)
Process completed with exit code 101.
|
build (ubuntu-latest, 1.63.0)
Process completed with exit code 101.
|
build (macos-latest, 1.63.0)
Process completed with exit code 101.
|
build (windows-latest, beta)
Process completed with exit code 101.
|
build (windows-latest, stable)
Process completed with exit code 101.
|
build (windows-latest, 1.63.0)
The job running on runner GitHub Actions 15 has exceeded the maximum execution time of 360 minutes.
|
build (windows-latest, 1.63.0)
The operation was canceled.
|
incremental-mutants
The job running on runner GitHub Actions 10 has exceeded the maximum execution time of 360 minutes.
|
incremental-mutants
The operation was canceled.
|