Upgrade bech32 dependency (iterative) #15382
Triggered via pull request
September 12, 2024 17:54
Status
Failure
Total duration
8h 42m 54s
Artifacts
–
build.yml
on: pull_request
coverage
6m 18s
benchmark
35m 2s
check_commits
6m 48s
check_release
2m 36s
fuzz
1h 19m
linting
1m 15s
rustfmt
11s
incremental-mutants
10m 24s
Matrix: build
Annotations
6 errors
rustfmt
Process completed with exit code 1.
|
linting
Process completed with exit code 101.
|
incremental-mutants
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
incremental-mutants
The operation was canceled.
|
build (windows-latest, 1.63.0)
The job running on runner GitHub Actions 17 has exceeded the maximum execution time of 360 minutes.
|
build (windows-latest, 1.63.0)
The operation was canceled.
|