Skip to content

Upgrade bech32 dependency (iterative) #15382

Upgrade bech32 dependency (iterative)

Upgrade bech32 dependency (iterative) #15382

Triggered via pull request September 12, 2024 17:54
Status Failure
Total duration 8h 42m 54s
Artifacts

build.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
rustfmt
Process completed with exit code 1.
linting
Process completed with exit code 101.
incremental-mutants
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
incremental-mutants
The operation was canceled.
build (windows-latest, 1.63.0)
The job running on runner GitHub Actions 17 has exceeded the maximum execution time of 360 minutes.
build (windows-latest, 1.63.0)
The operation was canceled.