Skip to content

chore(deps): update dependency @preconstruct/cli to v2.8.8 (#9346) #2771

chore(deps): update dependency @preconstruct/cli to v2.8.8 (#9346)

chore(deps): update dependency @preconstruct/cli to v2.8.8 (#9346) #2771

Triggered via push October 1, 2024 23:10
Status Failure
Total duration 6h 0m 24s
Artifacts

tests_ci.yml

on: push
Linting
1m 46s
Linting
Linting
4m 57s
Linting
Package Unit Tests
2m 19s
Package Unit Tests
Field CRUD Tests PostgreSQL
1m 34s
Field CRUD Tests PostgreSQL
Field CRUD Tests SQLite
1m 22s
Field CRUD Tests SQLite
Field CRUD Tests MySQL
1m 28s
Field CRUD Tests MySQL
Testing example project
4m 26s
Testing example project
Ensure Next in App directory builds
4m 56s
Ensure Next in App directory builds
Matrix: Integration tests for Admin UI
Matrix: Smoke Tests For Examples
Matrix: API Tests MySQL
Matrix: API Tests PostgreSQL
Matrix: API Tests SQLite
Fit to window
Zoom out
Zoom in

Annotations

3 errors
Integration tests for Admin UI (live-reloading.test.ts)
Process completed with exit code 1.
Integration tests for Admin UI (filters.test.ts)
The job running on runner GitHub Actions 40 has exceeded the maximum execution time of 360 minutes.
Integration tests for Admin UI (filters.test.ts)
The operation was canceled.