Skip to content

[CI][E2E] Split gen12 pre-commit testing into build and run stages #3691

[CI][E2E] Split gen12 pre-commit testing into build and run stages

[CI][E2E] Split gen12 pre-commit testing into build and run stages #3691

Triggered via pull request December 20, 2024 19:34
Status Failure
Total duration 1h 47m 12s
Artifacts 2

sycl-post-commit.yml

on: pull_request
Linux (Self build + no-assertions)  /  Build + LIT
9m 40s
Linux (Self build + no-assertions) / Build + LIT
Matrix: e2e-lin
e2e-win  /  Intel GEN12 Graphics with Level Zero
26m 53s
e2e-win / Intel GEN12 Graphics with Level Zero
Fit to window
Zoom out
Zoom in

Annotations

1 error and 1 warning
macOS / Build
zstd 1.5.6 is already installed and up-to-date. To reinstall 1.5.6, run: brew reinstall zstd

Artifacts

Produced during runtime
Name Size
sycl_linux_default Expired
350 MB
sycl_windows_default Expired
556 MB