Skip to content

General build upgrades and improvements #46

General build upgrades and improvements

General build upgrades and improvements #46

Triggered via pull request March 1, 2024 08:45
Status Cancelled
Total duration 3m 46s
Artifacts

on.pr.yml

on: pull_request
Pre-flight Checks
2m 9s
Pre-flight Checks
Checks  /  Dependency Review
Checks / Dependency Review
Matrix: Checks / CodeQL
Waiting for pending jobs
Tests  /  Testsuite
Tests / Testsuite
Matrix: Build / gradle
Waiting for pending jobs
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 1 warning
Checks / Formatting
Canceling since a higher priority waiting request for 'pr-1' exists
Checks / Formatting
The operation was canceled.
Checks / API Check
Canceling since a higher priority waiting request for 'pr-1' exists
Checks / API Check
The operation was canceled.
Build / Build (Ubuntu)
Canceling since a higher priority waiting request for 'pr-1' exists
Build / Build (Ubuntu)
The operation was canceled.
Checks / Dependency Graph
Canceling since a higher priority waiting request for 'pr-1' exists
Checks / Detekt
Canceling since a higher priority waiting request for 'pr-1' exists
Checks / Detekt
The operation was canceled.
Pre-flight Checks
Failed to save cache entry with path '/home/runner/.gradle/caches/*/kotlin-dsl/*/*' and key: kotlin-dsl-4a3a707bc1577ab40507ffa9885bd8cd: Error: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2