General build upgrades and improvements #46
on.pr.yml
on: pull_request
Pre-flight Checks
2m 9s
Checks
/
API Check
1m 18s
Checks
/
Formatting
1m 18s
Checks
/
Gradle Wrapper
11s
Checks
/
Detekt
1m 20s
Checks
/
Dependency Review
Matrix: Checks / CodeQL
Waiting for pending jobs
Tests
/
Testsuite
Matrix: Build / gradle
Waiting for pending jobs
Annotations
9 errors and 1 warning
Checks / Formatting
Canceling since a higher priority waiting request for 'pr-1' exists
|
Checks / Formatting
The operation was canceled.
|
Checks / API Check
Canceling since a higher priority waiting request for 'pr-1' exists
|
Checks / API Check
The operation was canceled.
|
Build / Build (Ubuntu)
Canceling since a higher priority waiting request for 'pr-1' exists
|
Build / Build (Ubuntu)
The operation was canceled.
|
Checks / Dependency Graph
Canceling since a higher priority waiting request for 'pr-1' exists
|
Checks / Detekt
Canceling since a higher priority waiting request for 'pr-1' exists
|
Checks / Detekt
The operation was canceled.
|
Pre-flight Checks
Failed to save cache entry with path '/home/runner/.gradle/caches/*/kotlin-dsl/*/*' and key: kotlin-dsl-4a3a707bc1577ab40507ffa9885bd8cd: Error: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
|