Introduce options to configure the creation of an event-bus consumer #1368
Triggered via pull request
February 6, 2025 12:29
Status
Failure
Total duration
6h 0m 28s
Artifacts
–
ci-4.x.yml
on: pull_request
Matrix: Run tests
Deploy to OSSRH
0s
Annotations
11 errors
Run tests (windows-latest, 8)
The job running on runner GitHub Actions 208 has exceeded the maximum execution time of 360 minutes.
|
Run tests (windows-latest, 8)
already complete
|
Run tests (windows-latest, 8)
The operation was canceled.
|
Run tests (ubuntu-latest, 8, -PtestDomainSockets)
The job running on runner GitHub Actions 124 has exceeded the maximum execution time of 360 minutes.
|
Run tests (ubuntu-latest, 8, -PtestDomainSockets)
The operation was canceled.
|
Run tests (ubuntu-latest, 21)
The job running on runner GitHub Actions 55 has exceeded the maximum execution time of 360 minutes.
|
Run tests (ubuntu-latest, 21)
The operation was canceled.
|
Run tests (ubuntu-latest, 8)
The job running on runner GitHub Actions 399 has exceeded the maximum execution time of 360 minutes.
|
Run tests (ubuntu-latest, 8)
The operation was canceled.
|
Run tests (ubuntu-latest, 8, -PtestNativeTransport)
The job running on runner GitHub Actions 173 has exceeded the maximum execution time of 360 minutes.
|
Run tests (ubuntu-latest, 8, -PtestNativeTransport)
The operation was canceled.
|