Skip to content

Merge pull request #6346 from ecamp/renovate/eslint-compat-1.x #2723

Merge pull request #6346 from ecamp/renovate/eslint-compat-1.x

Merge pull request #6346 from ecamp/renovate/eslint-compat-1.x #2723

Triggered via push November 14, 2024 22:01
Status Cancelled
Total duration 2m 10s
Artifacts 2
Continuous integration  /  api-check-needed
4s
Continuous integration / api-check-needed
Continuous integration  /  Tests: Print
54s
Continuous integration / Tests: Print
Continuous integration  /  Tests: PDF
27s
Continuous integration / Tests: PDF
Continuous integration  /  e2e-check-needed
5s
Continuous integration / e2e-check-needed
Continuous integration  /  frontend-check-needed
9s
Continuous integration / frontend-check-needed
Continuous integration  /  Lint: ClientPrint (ESLint)
23s
Continuous integration / Lint: ClientPrint (ESLint)
Continuous integration  /  Lint: Print (ESLint)
35s
Continuous integration / Lint: Print (ESLint)
Continuous integration  /  Tests: API
0s
Continuous integration / Tests: API
Continuous integration  /  Lint: API (php-cs-fixer)
0s
Continuous integration / Lint: API (php-cs-fixer)
Continuous integration  /  ...  /  Tests: End-to-end (build job)
42s
Continuous integration / Tests: End-to-end build / Tests: End-to-end (build job)
Continuous integration  /  Lint: e2e (ESLint)
30s
Continuous integration / Lint: e2e (ESLint)
Continuous integration  /  Tests: Frontend
1m 18s
Continuous integration / Tests: Frontend
Continuous integration  /  Lint: Frontend (ESLint)
41s
Continuous integration / Lint: Frontend (ESLint)
Matrix: Continuous integration / Tests: End-to-end run / Tests: End-to-end
Continuous integration  /  Finish coveralls report
0s
Continuous integration / Finish coveralls report
Continuous integration  /  workflow-success
3s
Continuous integration / workflow-success
Continuous integration  /  Send out CI success event
0s
Continuous integration / Send out CI success event
Build and push docker images  /  Build images and push
Build and push docker images / Build images and push
Upgrade or install deployment  /  Deploy to Kubernetes
Upgrade or install deployment / Deploy to Kubernetes
Fit to window
Zoom out
Zoom in

Annotations

10 errors and 13 warnings
Continuous integration / Tests: End-to-end run / Tests: End-to-end (chrome)
Canceling since a higher priority waiting request for 'CI + CD for devel-push-devel' exists
Continuous integration / Tests: End-to-end run / Tests: End-to-end (edge)
Canceling since a higher priority waiting request for 'CI + CD for devel-push-devel' exists
Continuous integration / Tests: End-to-end run / Tests: End-to-end (firefox)
Canceling since a higher priority waiting request for 'CI + CD for devel-push-devel' exists
Continuous integration / Tests: Frontend
Canceling since a higher priority waiting request for 'CI + CD for devel-push-devel' exists
Continuous integration / Tests: Frontend
The operation was canceled.
Continuous integration / workflow-success
Job frontend-tests failed with status cancelled
Continuous integration / workflow-success
Job e2e-tests-run failed with status cancelled
Continuous integration / Tests: End-to-end run / Tests: End-to-end (chrome)
No files were found with the provided path: e2e/data/**/*. No artifacts will be uploaded.
Continuous integration / Tests: End-to-end run / Tests: End-to-end (edge)
No files were found with the provided path: e2e/data/**/*. No artifacts will be uploaded.
Continuous integration / Tests: End-to-end run / Tests: End-to-end (firefox)
No files were found with the provided path: e2e/data/**/*. No artifacts will be uploaded.

Artifacts

Produced during runtime
Name Size
e2e-tests-images
225 MB
ecamp~ecamp3~5Q5PQH.dockerbuild
62.9 KB