Skip to content

Release planning

zoombody edited this page Sep 5, 2014 · 13 revisions

Just my brainstorming, nothing official:

  • 2.2.2 - Fix bugs with UI impact but defer structural bugs. Final Rails 3.2/Ruby 1.8.7 release. Release mid-September.
  • 2.3 - Immediate feature freeze. Fix deferred structural bugs from 2.2, finalize Rails 4.1 migration (see #110), get tests passing. Release early October.
  • 2.4 - MAYBE - Consider limited new features (attachments?) and perhaps some minor under-the-hood cleanup (e.g. password hashing), but keep the current interface. Release late October or early November.
  • 3.0 - New interface but NO feature changes. Basically only the views and helpers should be modified. Redesign website to accompany. Release by end of February 2015 (soft target).
  • 3.1 and beyond - Feature/structural/interface changes as desired.
Clone this wiki locally