Skip to content

Merge pull request #21 from lburgazzoli/dapr-1.11.3 #18

Merge pull request #21 from lburgazzoli/dapr-1.11.3

Merge pull request #21 from lburgazzoli/dapr-1.11.3 #18

Triggered via push September 7, 2023 15:44
Status Failure
Total duration 21m 59s
Artifacts

build-main.yml

on: push
Matrix: e2e-olm / e2e-olm
Matrix: e2e-operator / e2e-operator
publish  /  publish
publish / publish
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 1 warning
e2e-operator / e2e-operator (1.28.0)
Process completed with exit code 2.
e2e-operator / e2e-operator (1.27.3)
The job was canceled because "_1_28_0" failed.
e2e-operator / e2e-operator (1.27.3)
The operation was canceled.
e2e-operator / e2e-operator (1.27.3)
Failed to restore: The operation cannot be completed in timeout.