Skip to content

Tests

Tests #1854

Triggered via schedule November 16, 2023 01:19
Status Failure
Total duration 2h 41m 30s
Artifacts 1
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

ci.yaml

on: schedule
Matrix: Unit test charm
Lint  /  Lint .github/workflows/
7s
Lint / Lint .github/workflows/
Lint  /  tox run -e lint
24s
Lint / tox run -e lint
Build charm  /  ...  /  Get workflow version
5s
Build charm / Get workflow version / Get workflow version
Check libraries
24s
Check libraries
(GH hosted) Collect integration test groups
23s
(GH hosted) Collect integration test groups
Build charm  /  Collect charms
9s
Build charm / Collect charms
Matrix: Build charm / build
Matrix: gh-hosted-integration-test
Fit to window
Zoom out
Zoom in

Annotations

2 errors
2.9/stable - (GH hosted) high_availability/test_self_healing.py | group 1 | jammy
The job running on runner GitHub Actions 25 has exceeded the maximum execution time of 120 minutes.

Artifacts

Produced during runtime
Name Size
charms-packed-with-cache Expired
27.3 MB