Skip to content

Update data-platform-workflows to v7 #1845

Update data-platform-workflows to v7

Update data-platform-workflows to v7 #1845

Triggered via pull request November 15, 2023 01:22
Status Failure
Total duration 3h 2m 54s
Artifacts 2
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

ci.yaml

on: pull_request
Matrix: Unit test charm
Build charm  /  ...  /  Get workflow version
4s
Build charm / Get workflow version / Get workflow version
Lint  /  Lint .github/workflows/
6s
Lint / Lint .github/workflows/
Lint  /  tox run -e lint
28s
Lint / tox run -e lint
Check libraries
29s
Check libraries
Build charm  /  Collect charms
13s
Build charm / Collect charms
(GH hosted) Collect integration test groups
30s
(GH hosted) Collect integration test groups
Matrix: Build charm / build
Matrix: gh-hosted-integration-test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Check libraries
Charmcraft libraries are not up to date.
2.9/stable - (GH hosted) test_backups.py | group 1 | jammy
Process completed with exit code 1.
2.9/stable - (GH hosted) high_availability/test_self_healing.py | group 1 | jammy
Process completed with exit code 1.
3.1/stable - (GH hosted) test_backups.py | group 1 | jammy
The job running on runner GitHub Actions 56 has exceeded the maximum execution time of 120 minutes.
3.1/stable - (GH hosted) test_backups.py | group 1 | jammy
The operation was canceled.

Artifacts

Produced during runtime
Name Size
charms-packed-with-cache Expired
27.3 MB
juju-crashdump Expired
511 KB