Skip to content

chore(deps): lock file maintenance #83

chore(deps): lock file maintenance

chore(deps): lock file maintenance #83

Triggered via push January 21, 2024 19:30
Status Failure
Total duration 38s
Artifacts

bring-it.yaml

on: push
Matrix: test
publish
0s
publish
Fit to window
Zoom out
Zoom in

Annotations

8 errors
test (ubuntu-latest, current)
Process completed with exit code 1.
test (ubuntu-latest, lts/-1)
Process completed with exit code 1.
test (windows-latest, lts/*)
The operation was canceled.
test (windows-latest, current)
The operation was canceled.
test (windows-latest, lts/-1)
The operation was canceled.
test (macos-latest, current)
The operation was canceled.
test (macos-latest, lts/*)
The operation was canceled.
test (macos-latest, lts/-1)
The operation was canceled.