Skip to content

chore(deps): lock file maintenance #104

chore(deps): lock file maintenance

chore(deps): lock file maintenance #104

Triggered via push September 22, 2024 19:33
Status Failure
Total duration 42s
Artifacts

bring-it.yaml

on: push
Matrix: test
publish
0s
publish
Fit to window
Zoom out
Zoom in

Annotations

8 errors
test (ubuntu-latest, lts/-1)
Process completed with exit code 1.
test (ubuntu-latest, current)
The job was canceled because "ubuntu-latest_lts_-1" failed.
test (macos-latest, lts/*)
The job was canceled because "ubuntu-latest_lts_-1" failed.
test (macos-latest, lts/-1)
The job was canceled because "ubuntu-latest_lts_-1" failed.
test (windows-latest, current)
The job was canceled because "ubuntu-latest_lts_-1" failed.
test (windows-latest, lts/-1)
The job was canceled because "ubuntu-latest_lts_-1" failed.
test (windows-latest, lts/*)
The job was canceled because "ubuntu-latest_lts_-1" failed.
test (macos-latest, current)
The job was canceled because "ubuntu-latest_lts_-1" failed.