Skip to content

First test checkpoint: #968

First test checkpoint:

First test checkpoint: #968

Triggered via push January 18, 2024 22:21
Status Failure
Total duration 12m 43s
Artifacts

ci.yml

on: push
Matrix: clang-sanitizers
Matrix: linux-compat
Matrix: linux-compiler-compat
Matrix: windows-vc14
Fit to window
Zoom out
Zoom in

Annotations

42 errors
linux-compat (al2-x64)
Process completed with exit code 1.
linux-compiler-compat (gcc-7)
Process completed with exit code 1.
osx
Process completed with exit code 1.
linux-compat (opensuse-leap)
The job was canceled because "al2-x64" failed.
linux-compat (opensuse-leap)
The operation was canceled.
linux-compat (manylinux2014-x64)
The job was canceled because "al2-x64" failed.
linux-compat (manylinux2014-x64)
The operation was canceled.
linux-compat (manylinux1-x86)
The job was canceled because "al2-x64" failed.
linux-compat (manylinux1-x86)
The operation was canceled.
linux-compat (rhel8-x64)
The job was canceled because "al2-x64" failed.
linux-compat (rhel8-x64)
The operation was canceled.
linux-shared-libs
Process completed with exit code 1.
linux-compat (fedora-34-x64)
The job was canceled because "al2-x64" failed.
linux-compat (manylinux2014-x86)
The job was canceled because "al2-x64" failed.
linux-compat (fedora-34-x64)
The operation was canceled.
linux-compat (manylinux2014-x86)
The operation was canceled.
linux-compat (manylinux1-x64)
The job was canceled because "al2-x64" failed.
linux-compat (manylinux1-x64)
The operation was canceled.
linux-compiler-compat (gcc-6)
The job was canceled because "gcc-7" failed.
linux-compiler-compat (gcc-6)
The operation was canceled.
linux-compiler-compat (gcc-4.8)
The job was canceled because "gcc-7" failed.
linux-compiler-compat (gcc-4.8)
The operation was canceled.
linux-compiler-compat (clang-9)
The job was canceled because "gcc-7" failed.
linux-compiler-compat (clang-9)
The operation was canceled.
linux-compiler-compat (clang-11)
The job was canceled because "gcc-7" failed.
linux-compiler-compat (clang-11)
The operation was canceled.
linux-compiler-compat (gcc-5)
The job was canceled because "gcc-7" failed.
linux-compiler-compat (gcc-5)
The operation was canceled.
linux-compiler-compat (clang-10)
The job was canceled because "gcc-7" failed.
linux-compiler-compat (clang-10)
The operation was canceled.
linux-compiler-compat (clang-8)
The job was canceled because "gcc-7" failed.
linux-compiler-compat (clang-8)
The operation was canceled.
linux-compiler-compat (clang-3)
The job was canceled because "gcc-7" failed.
linux-compiler-compat (clang-3)
The operation was canceled.
linux-compiler-compat (clang-6)
The job was canceled because "gcc-7" failed.
linux-compiler-compat (clang-6)
The operation was canceled.
linux-compiler-compat (gcc-8)
The job was canceled because "gcc-7" failed.
linux-compiler-compat (gcc-8)
The operation was canceled.
downstream
Process completed with exit code 1.
clang-sanitizers (,thread)
Process completed with exit code 1.
clang-sanitizers (,address,undefined)
The job was canceled because "_thread" failed.
clang-sanitizers (,address,undefined)
The operation was canceled.