Skip to content

Commit

Permalink
Add Note on why L1s must sync the P-Chain (#222)
Browse files Browse the repository at this point in the history
  • Loading branch information
ashucoder9 authored Dec 10, 2024
2 parents 3ddd41c + e724d79 commit 242d72b
Showing 1 changed file with 2 additions and 0 deletions.
2 changes: 2 additions & 0 deletions content/guide/subnet-vs-l1-validators.mdx
Original file line number Diff line number Diff line change
Expand Up @@ -45,6 +45,8 @@ L1 validators are required to:
- Sync and validate a specific L1
- Sync the latest P-Chain state

Syncing the P-Chain state is required for basic L1 functionality. It enables the L1 to track its validator weights so that it can perform consensus and validate ICM messages from other L1s, including the P-Chain.

L1 validators do not need to:
- Stake 2,000 AVAX
- Validate or participate in consensus on the Primary Network (X, P, and C-Chains)
Expand Down

0 comments on commit 242d72b

Please sign in to comment.