Skip to content

chore(deps): bump google.golang.org/grpc from 1.67.1 to 1.68.0 #34792

chore(deps): bump google.golang.org/grpc from 1.67.1 to 1.68.0

chore(deps): bump google.golang.org/grpc from 1.67.1 to 1.68.0 #34792

Triggered via pull request November 8, 2024 22:23
Status Cancelled
Total duration 11m 26s
Artifacts 1

ci-build.yaml

on: pull_request
Build & cache Go code
3m 42s
Build & cache Go code
Build, test & lint UI code
1m 37s
Build, test & lint UI code
Ensure Go modules synchronicity
27s
Ensure Go modules synchronicity
Lint Go code
27s
Lint Go code
Check changes to generated code
4m 42s
Check changes to generated code
Matrix: Run end-to-end tests
Run unit tests for Go packages
5m 14s
Run unit tests for Go packages
Run unit tests with -race for Go packages
7m 0s
Run unit tests with -race for Go packages
E2E Tests - Composite result
0s
E2E Tests - Composite result
Process & analyze test artifacts
0s
Process & analyze test artifacts
Fit to window
Zoom out
Zoom in

Annotations

13 errors
Lint Go code
golangci-lint exit with code 5
Ensure Go modules synchronicity
Process completed with exit code 1.
Run end-to-end tests (v1.30.4, false)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/20706/merge' exists
Run end-to-end tests (v1.30.4, false)
The operation was canceled.
Run end-to-end tests (v1.28.13, false)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/20706/merge' exists
Run end-to-end tests (v1.28.13, false)
The operation was canceled.
Run end-to-end tests (v1.31.0, true)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/20706/merge' exists
Run end-to-end tests (v1.31.0, true)
The operation was canceled.
Run unit tests with -race for Go packages
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/20706/merge' exists
Run unit tests with -race for Go packages
The operation was canceled.
Run end-to-end tests (v1.29.8, false)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/20706/merge' exists
Run end-to-end tests (v1.29.8, false)
The operation was canceled.
E2E Tests - Composite result
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
test-results
1.23 MB