Skip to content

flink-connector-aws: nightly build #187

flink-connector-aws: nightly build

flink-connector-aws: nightly build #187

Triggered via schedule July 27, 2023 00:06
Status Cancelled
Total duration 6m 48s
Artifacts

nightly.yml

on: schedule
Matrix: compile_and_test
Fit to window
Zoom out
Zoom in

Annotations

11 errors
compile_and_test (1.18-SNAPSHOT) / compile_and_test (11)
Process completed with exit code 1.
compile_and_test (1.18-SNAPSHOT) / compile_and_test (8)
The job was canceled because "_11" failed.
compile_and_test (1.18-SNAPSHOT) / compile_and_test (8)
The operation was canceled.
compile_and_test (1.16-SNAPSHOT) / compile_and_test (11)
FailFast: cancelling since parallel instance has failed
compile_and_test (1.16-SNAPSHOT) / compile_and_test (11)
The operation was canceled.
compile_and_test (1.17-SNAPSHOT) / compile_and_test (11)
FailFast: cancelling since parallel instance has failed
compile_and_test (1.17-SNAPSHOT) / compile_and_test (11)
The operation was canceled.
compile_and_test (1.17-SNAPSHOT) / compile_and_test (8)
FailFast: cancelling since parallel instance has failed
compile_and_test (1.17-SNAPSHOT) / compile_and_test (8)
The operation was canceled.
compile_and_test (1.16-SNAPSHOT) / compile_and_test (8)
FailFast: cancelling since parallel instance has failed
compile_and_test (1.16-SNAPSHOT) / compile_and_test (8)
The operation was canceled.