Skip to content

Upgrade Netty to 4.1.107.Final and io_uring to 0.0.25.Final (#4224) #1483

Upgrade Netty to 4.1.107.Final and io_uring to 0.0.25.Final (#4224)

Upgrade Netty to 4.1.107.Final and io_uring to 0.0.25.Final (#4224) #1483

Triggered via push March 14, 2024 00:51
Status Failure
Total duration 1h 24m 52s
Artifacts

bk-ci.yml

on: push
Integration Tests
27m 32s
Integration Tests
Backward compatibility tests
21m 51s
Backward compatibility tests
Build with windows on JDK 11
7m 31s
Build with windows on JDK 11
Build with macos on JDK 11
4m 10s
Build with macos on JDK 11
OWASP Dependency Check
0s
OWASP Dependency Check
Matrix: jdk-compatibility-checks
Matrix: unit-tests
Fit to window
Zoom out
Zoom in

Annotations

2 errors
Client Tests
The job running on runner GitHub Actions 20 has exceeded the maximum execution time of 75 minutes.
Client Tests
The operation was canceled.