Network Topology Dashboard Update #2653
Triggered via pull request
November 6, 2023 19:34
Status
Cancelled
Total duration
2m 52s
Artifacts
–
go.yml
on: pull_request
Check whether tests need to be run based on diff
16s
Check whether snowflake tests need to be run based on diff
15s
Verify docs and spelling
1m 14s
Check tidy and manifest
21s
Check tidy and manifest
29s
Matrix: Golangci-lint
Matrix: Snowflake-golangci-lint
Matrix: Unit test
Matrix: Unit test snowflake
Annotations
6 errors
Golangci-lint (ubuntu-latest)
The run was canceled by @github-actions.
|
Golangci-lint (ubuntu-latest)
The operation was canceled.
|
Golangci-lint (macos-latest)
The run was canceled by @github-actions.
|
Golangci-lint (macos-latest)
The operation was canceled.
|
Unit test (ubuntu-latest)
The run was canceled by @github-actions.
|
Unit test (ubuntu-latest)
The operation was canceled.
|