-
Notifications
You must be signed in to change notification settings - Fork 99
Commit
This commit does not belong to any branch on this repository, and may belong to a fork outside of the repository.
Merge pull request #208 from bigbulb/main
xGov-208 - DigiLeaf Electric Vehicle Chargers
- Loading branch information
Showing
1 changed file
with
92 additions
and
0 deletions.
There are no files selected for viewing
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,92 @@ | ||
--- | ||
id: 208 | ||
period: 3 | ||
title: DigiLeaf Electric Vehicle Chargers | ||
author: Trenton Austin (@bigbulb) | ||
email: [email protected] | ||
discussions-to: https://forum.algorand.org/t/xgov-207-digileaf-electric-vehicle-chargers/11873 | ||
company_name: DigiLeaf Inc. | ||
category: Other | ||
focus_area: Other | ||
open_source: No | ||
funding_type: Proactive | ||
amount_requested: 300000 | ||
delivery_date: 2024-08-01 | ||
status: Final | ||
--- | ||
|
||
## Abstract | ||
|
||
DigiLeaf is an Energy Token that users may earn with solar panels and spend at our EV charging stations with the goal of building a truly decentralized carbon neutral grid. | ||
https://digileaf.io/ | ||
|
||
Our hardware includes: | ||
|
||
Solar panels - (Residential and Commercial) | ||
|
||
Inverters (Residential and Commercial) | ||
|
||
Type 2 Electric Vehicle Chargers (Residential and Commercial) | ||
|
||
Type 3 Super Chargers (Commercial Only) | ||
|
||
Power storage (Residential and Commercial) | ||
|
||
## Team | ||
|
||
DigiLeaf is an experienced team of environmental engineers and blockchain developers. | ||
|
||
## Experience with Algorand | ||
|
||
From creation in 2022, DigiLeaf has operated with consistent uptime in: | ||
|
||
DigiLeaf DApp - Connecting hardware | ||
|
||
License Portal - Buy/Renew Licenses | ||
|
||
DigiLeaf Mobile App | ||
|
||
(i) Finding chargers | ||
|
||
(ii) Monitoring hardware | ||
|
||
(iii) Buy Leaf$ with credit card, Sell Leaf$ to bank | ||
|
||
Rewards - To owners of DigiLeaf solar hardware | ||
|
||
Charger Uptime - Connectivity and availability | ||
|
||
## Present Proposal | ||
|
||
DigiLeaf proposes to operate a (4) stall 250 Amp super charger station in Southern California | ||
|
||
### Deliverable | ||
|
||
4 stall ev charging station build on the algornad network. Please see Future Blueprint for milestones. | ||
|
||
## Future Blueprint | ||
|
||
The first milestone can be created within 3 months. | ||
|
||
**Milestone 1:** 300,000 Algorand | ||
|
||
Architectural and Engineering design plans for selected location for the (4) stall 250 Amp super charger station. | ||
|
||
Land lease signed (doesn’t cover rent) and plans are approved by the city. | ||
|
||
**Milestone 2:** 800,000 Algorand | ||
|
||
Acquisition of hardware. | ||
|
||
Beginning of installation of transformer and hardware | ||
|
||
## Benefits for the community | ||
|
||
1- Consistent daily transaction volume via chargers. Each charger can fully charge about 15,000 vehicles a year. | ||
2- New Algorand holders who would not normally use crypto currency. _ Support of actual use case scenario helping crypto currency as a whole. | ||
3- Low carbon emissions on the roads. | ||
4- Increase access to electrical vehicle chargers._ Increase decentralize the grid. | ||
|
||
## Additional information | ||
|
||
The land available for a long term lease depends on when we are awarded funds. We currently have a short list of locations in the San Diego County area and are ready to move on design plans immediately. |