Skip to content

build(deps): bump google.golang.org/grpc from 1.36.0 to 1.53.0 in /examples/go/example1 #2539

build(deps): bump google.golang.org/grpc from 1.36.0 to 1.53.0 in /examples/go/example1

build(deps): bump google.golang.org/grpc from 1.36.0 to 1.53.0 in /examples/go/example1 #2539

Status Failure
Total duration 4m 1s
Artifacts

test.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (1.17, ubuntu-latest)
Process completed with exit code 2.
test (1.17, macOS-latest)
The job was canceled because "_1_17_ubuntu-latest" failed.
test (1.17, macOS-latest)
The operation was canceled.
test (1.17, windows-latest)
The job was canceled because "_1_17_ubuntu-latest" failed.
test (1.17, windows-latest)
The operation was canceled.