Bump gevent from 22.10.2 to 23.7.0 in /api #4217
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
ci_cd.yml
on: pull_request
Add stack label
0s
Matrix: Run Playwright tests
Matrix: Run Nuxt checks
Matrix: Run checks for packages/*
Check Nuxt build
0s
Matrix: Build Docker images
Post Playwright test debugging instructions
4s
Matrix: Run Playwright tests
Matrix: Run Nuxt checks
Matrix: Run checks for packages/*
Run tests for the catalog
0s
Run tests for ingestion-server
0s
Run tests for the API
0s
Matrix: Run Django checks
Run catalog checks
0s
Matrix: Publish Docker images
Matrix: Run Django checks
Send Slack report
0s
Annotations
8 errors
Build Docker images (upstream_db)
Canceling since a higher priority waiting request for 'CI + CD-refs/pull/2757/merge' exists
|
Build Docker images (upstream_db)
The operation was canceled.
|
Build Docker images (ingestion_server)
Canceling since a higher priority waiting request for 'CI + CD-refs/pull/2757/merge' exists
|
Build Docker images (ingestion_server)
The operation was canceled.
|
Build Docker images (api_nginx)
Canceling since a higher priority waiting request for 'CI + CD-refs/pull/2757/merge' exists
|
Build Docker images (api_nginx)
The operation was canceled.
|
Build Docker images (api)
Canceling since a higher priority waiting request for 'CI + CD-refs/pull/2757/merge' exists
|
Build Docker images (api)
The operation was canceled.
|