Skip to content

improve tests coverage of drush version constraint #270

improve tests coverage of drush version constraint

improve tests coverage of drush version constraint #270

Triggered via push June 26, 2024 06:49
Status Failure
Total duration 1m 50s
Artifacts
Matrix: tests
Matrix: publish
Fit to window
Zoom out
Zoom in

Annotations

9 errors
tests (11.0)
Process completed with exit code 2.
tests (10.3)
The job was canceled because "_11_0" failed.
tests (10.3)
The operation was canceled.
tests (9.5)
The job was canceled because "_11_0" failed.
tests (9.5)
The operation was canceled.
tests (8.9)
The job was canceled because "_11_0" failed.
tests (8.9)
The operation was canceled.
tests (9.0)
The job was canceled because "_11_0" failed.
tests (9.0)
The operation was canceled.