Skip to content

chore(deps): update pnpm to v9.12.2 (#9369) #1

chore(deps): update pnpm to v9.12.2 (#9369)

chore(deps): update pnpm to v9.12.2 (#9369) #1

Triggered via push October 27, 2024 02:23
Status Failure
Total duration 6h 0m 24s
Artifacts

tests_ci.yml

on: push
Linting
1m 44s
Linting
Linting
4m 35s
Linting
Package Unit Tests
2m 22s
Package Unit Tests
Field CRUD Tests PostgreSQL
1m 34s
Field CRUD Tests PostgreSQL
Field CRUD Tests SQLite
1m 32s
Field CRUD Tests SQLite
Field CRUD Tests MySQL
1m 26s
Field CRUD Tests MySQL
Testing example project
4m 34s
Testing example project
Ensure Next in App directory builds
4m 54s
Ensure Next in App directory builds
Matrix: Integration tests for Admin UI
Matrix: Smoke Tests For Examples
Matrix: API Tests MySQL
Matrix: API Tests PostgreSQL
Matrix: API Tests SQLite
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Linting: examples/extend-graphql-schema-nexus/schema.ts#L99
Right operand of ?? is unreachable because the left operand is never nullish.
Linting
Process completed with exit code 2.
API Tests PostgreSQL (3)
unable to access 'https://github.com/OpenSaasAU/keystone/': Failed to connect to github.com port 443 after 135188 ms: Connection timed out
API Tests PostgreSQL (3)
unable to access 'https://github.com/OpenSaasAU/keystone/': Failed to connect to github.com port 443 after 133337 ms: Connection timed out
Integration tests for Admin UI (live-reloading.test.ts)
Process completed with exit code 1.
Integration tests for Admin UI (list-view-crud.test.ts)
The job running on runner GitHub Actions 4 has exceeded the maximum execution time of 360 minutes.
Integration tests for Admin UI (list-view-crud.test.ts)
The operation was canceled.