You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
It is not possible to end a migration with disabled application, the button of a local account provider stays in a disabled stated Steps to reproduce
Install various applications with a remote provider and Mattermost, configuring all except Mattermost.
Install the migration app.
Attempt the migration.
Expected behavior
I expect to be possible to migrate the whole apps without issue
Actual behavior
Migration is blocked because the UI expects all apps to be migrated before proceeding with the account provider migration. However, if the app statuses and vhosts are falsified, you can bypass the app migration and continue with the account provider migration.
stephdl
changed the title
Migration: Not possible to finish a migration with disabled apps
Migration: Unable to complete with disabled applications
Sep 26, 2024
nrauso
added
verified
All test cases were verified successfully
and removed
testing
Packages are available from testing repositories
labels
Oct 1, 2024
It is not possible to end a migration with disabled application, the button of a local account provider stays in a disabled stated
Steps to reproduce
Expected behavior
I expect to be possible to migrate the whole apps without issue
Actual behavior
Migration is blocked because the UI expects all apps to be migrated before proceeding with the account provider migration. However, if the app statuses and vhosts are falsified, you can bypass the app migration and continue with the account provider migration.
Components
nethserver-ns8-migration:1.016
See also
https://mattermost.nethesis.it/nethesis/pl/zj4ns4n4sbgmxm8w3h1jmxm8ba
than @nrauso
The text was updated successfully, but these errors were encountered: