Skip to content

chore: add a test aggregation workflow #19

chore: add a test aggregation workflow

chore: add a test aggregation workflow #19

Triggered via pull request December 1, 2023 18:33
Status Failure
Total duration 1m 48s
Artifacts

integration-enterprise.yaml

on: pull_request
Matrix: integration
Fit to window
Zoom out
Zoom in

Annotations

9 errors
integration (kong/kong-gateway:3.1)
Process completed with exit code 2.
integration (kong/kong-gateway:3.3)
The job was canceled because "kong_kong-gateway_3_1" failed.
integration (kong/kong-gateway:3.3)
Process completed with exit code 2.
integration (kong/kong-gateway:3.2)
The job was canceled because "kong_kong-gateway_3_1" failed.
integration (kong/kong-gateway:3.2)
The operation was canceled.
integration (kong/kong-gateway:3.0)
The job was canceled because "kong_kong-gateway_3_1" failed.
integration (kong/kong-gateway:3.0)
The operation was canceled.
integration (kong/kong-gateway-dev:latest)
The job was canceled because "kong_kong-gateway_3_1" failed.
integration (kong/kong-gateway-dev:latest)
The operation was canceled.