Skip to content

Improve package layout and bazel build #233

Improve package layout and bazel build

Improve package layout and bazel build #233

Triggered via pull request December 12, 2023 12:06
@ftynseftynse
synchronize #20
improve-bazel
Status Failure
Total duration 15m 1s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

build.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

1 error and 1 warning
Build openstack22
The self-hosted runner: github22-ci-7 lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
Build openstack22
You are running out of disk space. The runner will stop working when the machine runs out of disk space. Free space left: 28 MB