Skip to content

Commit

Permalink
Merge pull request #846 from Dasharo/Assembly-Guide-Edits
Browse files Browse the repository at this point in the history
Update docs/transparent-validation/protectli/laboratory-assembly-guide.md
  • Loading branch information
macpijan authored Jun 28, 2024
2 parents c1b3ed1 + ce1b071 commit ba9fafb
Showing 1 changed file with 3 additions and 0 deletions.
Original file line number Diff line number Diff line change
Expand Up @@ -18,6 +18,9 @@ are needed to create testing stands for Protectli machines.
* 6x standard female-female connection wire 2.54/2.00 mm raster
* 2x RJ45 cable: 1 for RTE and 1 for the platform

When there are 4 or more Ethernet ports on the platform,
connect ports 3 and 4 together with an additional RJ45 cable.

=== "VP2410"

* VP2410 platform
Expand Down

0 comments on commit ba9fafb

Please sign in to comment.