Skip to content

fix: rename and more detailed I2S information #94

fix: rename and more detailed I2S information

fix: rename and more detailed I2S information #94

Triggered via push August 28, 2024 06:08
Status Failure
Total duration 3m 58s
Artifacts 1

release.yml

on: push
Matrix: build-dtbo
release
0s
release
Fit to window
Zoom out
Zoom in

Annotations

6 errors
build-dtbo (linux-rk2312)
Process completed with exit code 1.
build-dtbo (linux-stable)
Process completed with exit code 1.
build-dtbo (linux-rockchip)
The job was canceled because "linux-rk2312" failed.
build-dtbo (linux-rk356x)
The job was canceled because "linux-rk2312" failed.
build-dtbo (linux-rockchip)
Process completed with exit code 1.
build-dtbo (linux-rk356x)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
overlays Expired
64.7 KB