A phase 1 submission sheet was submitted to PSCIS yesterday (April 27) containing one crossing that was surveyed in 2022 for the Ministry of Transportation. There is a mistake in the UTM field. The value inputted was 9 when it should have been 10. This submission needs to be removed from the system.
Note: The UTM was changed and the spreadsheet was re submitted today (April 28).
Below is a screenshot of the submission confirmation (the one with the incorrect UTM that needs to be removed).
The text was updated successfully, but these errors were encountered:
There is no schedule for creating/submitting PSCIS fixes (and I'm not under contract with the province currently anyway) - so this is not going to be fixed in the source db any time soon.
However! I can easily prevent it from coming through into bcfishpass.crossings etc. I'll do that but leave this open as a reminder.
stream_crossing_id
: 198380, Five Mile CreekA phase 1 submission sheet was submitted to PSCIS yesterday (April 27) containing one crossing that was surveyed in 2022 for the Ministry of Transportation. There is a mistake in the UTM field. The value inputted was 9 when it should have been 10. This submission needs to be removed from the system.